31 Jul 2020 Fiskville Motosport Precinct Design Consultancy

iEDM, with Ernst & Young, were engaged by Motorsport Australia (MSA) to develp a business case for a motorsport precinct in Fiskville, Victoria. The project is supported by Sports & Recreation Victoria and the local adjoining Shire Councils. The integrated motorsport precinct includes: • Touring car and motorcycle track; • Go Kart circuit; • Motorcross facility; • Driver training and development facilities; • Drag racing track; and • Major event facilities. The client brief was to develop a modern, multivariate motorsport precinct that would enhance the profle and development of the sport in Victoria and Australia. Through the integrated design of highly accessible facilities, iEDM developed a concept & functional brief for MSA that incorporated stakeholder expectations along with operational resilience. The business case looked to develop a former Country Fire Association site, with a variety of existing facilities and site constraints. iEDM’s scope of works included: • Conceptual design and masterplan of entire facility; • Stakeholder consultation; • Explore 4 design options to inform business case development; • Functional brief and production of Concept Design Report; and • Production of detailed order of costs report.  ...

Read More

31 Jul 2020 Adelaide International Tennis

The Adelaide International was held in January 2020, a 7-day tournament which replaced the existing 3 day, World Tennis Challenge. iEDM were engaged by Tennis Australia to design and project manage the very first event under the new roof at War Memorial Drive, the first time this event was held in Adelaide. The event site is on a tight footprint located on the edge of the CBD, on a busy thoroughfare. The tournament, unlike previous in the past, utilised not one, but three neighbouring venues, all with staggered hand over dates due to current and coinciding events during both bump in and during the event. This required high level planning and strong stakeholder communication. iEDM were responsible for integrating the following services: Workshop and liaise with all internal departments of TA to develop an overlay Design and create an event plan Site and construction management Stakeholder management Infrastructure budget development and management Risk and Safety management Delivery planning and scheduling With the construction of the new roof over War Memorial Drive courts finishing just days before the commencement of our bump in, there were various challenges faced during this time. Designing a centre court and other precincts in never used before spaces without having...

Read More

20 Dec 2017 Newcastle 500 Supercars

The inaugural Newcastle 500 was held in November 2017 and was hailed a major success for the Sport and the City. iEDM were engaged by Supercars Australia to provide all site identification, feasibility, design, engineering and project management services for the project, which included substantial civil / enabling works as well as the overlay and event planning. The Newcastle Event site was located on the edge of the CBD, encompassed many businesses, around 3,000 residents, 3 public beaches, parklands and various other public areas. Logistically, these projects require a very high level of planning, stakeholder communication and design. Initially, the civil works were only to include minimal works required to make the streets safe for Supercars racing. However, it was soon realised that the project could achieve a tremendous legacy to the area of Newcastle East if we could conduct significant streetscape and services upgrades into the area at the same time. The services in Newcastle East were dilapidated and some water mains close to 100 years old. The project was able to deliver upgrades to water, stormwater, electrical infrastructure, as well as new footpaths, roads, smart infrastructure and landscaping. iEDM had only 12 months to design, plan and deliver around $25M of major CBD...

Read More

02 Dec 2015 Sydney 500 V8 Supercar Event

iEDM was engaged by V8 Supercars and the Homebush Motor Racing Authority (a NSW Government Agency) to deliver the inaugural 2009 V8 Supercar Event at Sydney Olympic Park. With a tight design and construction timeframe and approximately $20 Million of capital infrastructure to deliver, this project was a logistical Mount Everest. The 2010 event won the Event of the Year Award at the 2010 Annual V8 Supercars Gala Awards Ceremony. Closing down one of Australia’s largest event centres, the site of the 2000 Sydney Olympics, required a great deal of consultation and liaison with all stakeholders within the busy precinct. Work for the initial event included: Masterplanning of Event Overlay; Event Construction and Project Management; Civil Works Design and Project Management; Capital Works Design and Project Management; Seating Layouts, Corporate Layouts and Merchandising Layouts; Design of complex footing arrangement for new double storey Pit Building Complex; Construction Programming; Stakeholder Consultation and Management; Venue Management of Precinct during Event; Risk Management; Provision of over 80 detailed drawings for construction and operations of the precinct; and, Provision of Safety Officers and Industrial Relations Management. iEDM, in consultation with V8 Supercars and five times V8 Championship winner, Mark Skaife, were tasked with the design and documentation of the circuit itself to FIA standards. These standards must meet the approval...

Read More

02 Dec 2015 Pukekohe Park Raceway Upgrades

iEDM was approached by V8SC to assist with the development of a strategy to take the temporary infrastructure from the Hamilton Street Circuit to create a cost effective upgrade to the Pukekohe Park Raceway. The upgrades were to provide: Safety imrovements; Racing improvements; Rejuvinate the pit and paddock area to make a more functional space; New race control, administration and officials building; and Viewing and accessibility improvements. With a limited budget and a tight timeframe, iEDM needed to take very tight control of the deliverables and the overall project. In order to gain the Government funding approval, iEDM guaranteed the price of the project and worked with all stakeholders to make the project a success. Working with our clients and our specialist sub-consultants, we were able to develop a design which created a fresh aesthetic and exciting racing on a circuit where heritage also needed to be retained. iEDM placed a team in Auckland for the duration of the detailed design and delivery stage. Our team procured all items and acted as construction managers. The most pleasing and successful element of the upgrades was the addition of two new corners on the back straight. High speeds along the existing back straight, combined with a fixed runoff meant that we needed...

Read More

02 Dec 2015 Gold Coast 2018 Commonwealth Games Live Sites

iEDM was engaged by the Office of Commonwealth Games Coordination (OCGC) to provide preliminary budgets, designs and feasibility reports into four proposed live site venues, operating for the Gold Coast 2018 Commonwealth Games. In order to assist the OCGC to provide a framework to separate their budgets into infrastructure, operations and creative, iEDM was asked to design and cost two alternative overlay plans for each venue. Together with the OCGC, iEDM conducted stakeholder consultation with the various venue stakeholders and incorporated various visions into each design. The end product provided the OCGC with a range of alternatives and associated costs to guide their early strategic planning and development of their creative vision for each of the venues....

Read More

02 Dec 2015 Gold Coast 2018 Commonwealth Games Corporation

iEDM had various engagements in the lead up to and during the Gold Coast 2018 Commonwealth Games, working for the Organising Corporation, Gold Coast City Council, the Department of State Development, Infrastructure and Planning and assisting Contractors to deliver overlay scope. We were engaged by Gold Coast 2018 Commonwealth Games Corporation (GOLDOC) between 2014 and 2018 to provide Event Engineering Project Management Panel Services. During this time, iEDM  developed a detailed knowledge of the project and importantly, the venues and overlay design requirements. Over the course of the 4 year project, iEDM delivered some of the following projects: Venue Baseline Services Engineering Audits; Various Overlay Strategy Documents; Feasibility Study for a Temporary Roof over the Gold Coast Aquatic Centre; Acted as GOLDOC rep for the Feasibility Study into the Metricon Stadium Northern Stand; Seconded staff into GOLDOC Venue, Delivery and Overlay team (VDO); Delivered the first test event - the 2014 Pan Pacific Swimming Championships at Gold Coast Aquatic Centre; Live Sites Overlay and Feasibility Study; Commonwealth House initial Feasibility Study; and, Seconded approximately 6 staff with Moreton Hire for the delivery of approximately 45,000 square metres of temporary structure, HVAC and sub-structure. Key iEDM personnel became trusted local advisers for GOLDOC over the course of the Games development...

Read More

02 Dec 2015 500 Adelaide V8 Supercar Event

Over four days of motorsport and concerts, the 500 Adelaide is one of Australia's largest annual events. iEDM deliver approximately $17M of overlay infrastructure for this major South Australian Project, on behalf of the South Australian Tourism Commission. The event consists of over 1,500 facilities, 350 temporary structures, over 20,000sqm of marquee structure, 26km temporary fencing, 17,000 temporary seats, a world-class 3 storey temporary pit building, 3.2km of temporary circuit infrastructure, 137 generators or lighting towers, 26 big screens, 70 temporary portable buildings, 215 temporary amenities, 15,000sqm of carpet, a concert precinct, major merchandise and off-track entertainment precinct and various corporate entertainment platforms. iEDM are Engineering Project Managers for the 500 Adelaide, integrating the following services: Overlay and Engineering Design; Procurement, Financial and Project Management of over $16M of Overlay Infrastructure; Services, Structural, Civil Engineering; Site and Construction Management; Safety Management and Nominated Principal Contractor; Stakeholder Management; and, Event Project Feasibilities - Economic Impact, Project Design, Costing, Business Modelling We are responsible for the delivery of the following temporary infrastructure / works: Pit Building; Circuit works - barriers, debris fence, kerbs, tyres, communications; Traffic and Works on Roads; Grandstands; Corporate Facilities; Major Shade Structures; Electrical and Generation; Mechanical HVAC; Plumbing and Fire; Super Screens; Civil Works; Furniture, TV’s and Hire Equipment; Tents / Structures; Provisioning for 3rd party suppliers eg Catering and Broadcast; Gate Infrastructure; Telecommunications; Portable...

Read More

21 Nov 2015 Pan Pacific Swimming Championships

iEDM was commissioned by Gold Coast City Council (GCCC) to provide all design and project management for the 2014 Pan Pacific Swimming Championships (PPSC). The PPSC was the first test event for the 2018 Commonwealth Games and the first event to be held at the recently upgraded Gold Coast Aquatic Centre. At the time iEDM was appointed, there was an approximate $1.0M budget over-run of money approved by the funding parties and the budget provided by their cost consultant. Our first significant task was to develop a cost efficient design and drive the procurement of the major infrastructure items to the funded budget. We were able to achieve this using well designed, high quality, local products and were able to report to our client success in committing the budget from $2.5M to $1.5M. iEDM was responsible for the project management, programming, planning, design and engineering for the following temporary overlay infrastructure: Grandstands; Corporate Facilities; Electrical and Generation; Plumbing and Fire; Super Screens and Scoreboards; Furniture, TV’s and Hire Equipment; Tents / Structures; Provisioning for 3rd party suppliers eg Catering and Broadcast; Gate Infrastructure; Telecommunications; and, Portable Buildings and Toilets. We were able to deliver the project to a truly international standard within the available budget. Additionally, we introduced two significant design innovations: A first of...

Read More