iEDM - Integrated Event Delivery Management | Portfolio Categories Work Health and Safety
We integrate Design, Engineering and Delivery Management services to convert existing spaces into exciting new entertainment venues.
113
archive,tax-portfolio_category,term-work-health-and-safety,term-113,ajax_fade,page_not_loaded,,qode-child-theme-ver-9.0.5,qode-theme-ver-7.7,wpb-js-composer js-comp-ver-4.7.4,vc_responsive

Archive

18 Jun 2018 Real Madrid World of Football

The Real Madrid World of Football is a state of the art, digital and physical interactive football exhibition which premiered at Melbourne Museum, in June 2018. The exhibition is due to travel the world, visiting 15 cities over 5 years. Real Madrid is one of the World’s most popular sporting teams and valuable sporting brands. The exhibition features memorabilia and exciting interactive experiences to engage visitors. iEDM was engaged by iEC Exhibitions! to design, procure and deliver a 1500 square metre temporary structure which resembled the Bernabau – the Real Madrid home stadium. After an exhaustive international tender for the procurement of the structure, it was determined that the best way forward was to deliver the first event locally, through Australian stock to establish the pros and cons of running a project in a temporary structure. iEDM was then commissioned to deliver the structure and event overlay for the first exhibition, which was to be held on the forecourt of Melbourne Museum, in front of the Royal Exhibition Building. The forecourt of the Melbourne Museum is a large suspended slab over the top of an underground car park. The size of the structure proposed was far greater than any previous structure built on the site. We were...

Read More

20 Dec 2017 Newcastle 500 Supercars

The inaugural Newcastle 500 was held in November 2017 and was hailed a major success for the Sport and the City. iEDM were engaged by Supercars Australia to provide all site identification, feasibility, design, engineering and project management services for the project, which included substantial civil / enabling works as well as the overlay and event planning. The Newcastle Event site was located on the edge of the CBD, encompassed many businesses, around 3,000 residents, 3 public beaches, parklands and various other public areas. Logistically, these projects require a very high level of planning, stakeholder communication and design. Initially, the civil works were only to include minimal works required to make the streets safe for Supercars racing. However, it was soon realised that the project could achieve a tremendous legacy to the area of Newcastle East if we could conduct significant streetscape and services upgrades into the area at the same time. The services in Newcastle East were dilapidated and some water mains close to 100 years old. The project was able to deliver upgrades to water, stormwater, electrical infrastructure, as well as new footpaths, roads, smart infrastructure and landscaping. iEDM had only 12 months to design, plan and deliver around $25M of major CBD...

Read More

14 Dec 2015 South Sydney Rabbitohs

Since 2013, iEDM has been delivering game day Event Project Management for the South Sydney District Rugby League Football Club Ltd as part of their regional NRL match played at Barlow Park, Cairns. Initially a joint venture between the QLD State Government and the South Sydney Rabbitohs to drive domestic tourism to Cairns, the relocation of the Rabbitohs home game to Cairns has become an annual event. The relocation to Cairns also helps drive the Rabbitohs Membership and is seen as a significant benefit to the football club. Barlow Park itself is an athletics complex owned by the Cairns Regional Council hired by the Rabbitohs as a clean venue.  iEDM convert Barlow Park into a 17,000 pax venue capable of hosting a broadcast National Rugby League game to either Channel 9 or Foxtel. The venue is overlayed with a 3,000 temporary seat grandstand and other temporary catering and patron amenities. In addition to this iEDM was also responsible for: Game Day Event Management; Ushering; Crowd Management; Traffic Management; Temporary reticulation of electrical and water requirements; Workplace Health and Safety; and, Emergency and Security Provisions.  ...

Read More

02 Dec 2015 Townsville 400 V8 Supercars Event

In 2009, the Townsville 400 won the Event of the Year Award at the annual V8 Supercar Gala Awards Ceremony. With over 168,000 people attending the three day event in its first year, the precinct and venue has been an enormous success. iEDM was responsible for the Event Overlay Design and Delivery and worked tirelessly in close consultation with key stakeholders to ensure the success of the event. iEDM are currently contracted as Engineering Project Manager to deliver services for this event. iEDM’s core responsibilities for the Townsville 400 are as follows: Masterplanning of Event Overlay; Event Construction and Project Management; Seating Layouts, Corporate Layouts and Merchandising Layouts; Construction Programming; Stakeholder Consultation and Management; Approvals; Traffic Management on behalf of Townsville City Council; Venue Management of Precinct during Event; Risk Management; Provision of over 80 detailed drawings for construction and operations of the precinct; Provision of Safety Officers and Industrial Relations Management; Circuit Design and Certification to CAMS (FIA) Standards. ...

Read More

02 Dec 2015 Blackmores Sydney Running Festival

In 2010, the Blackmores Sydney Running Festival underwent a massive change to the course for the Sydney Marathon which was brought about by sustained growth of the event and its need to create a better traffic flow through the city. The Marathon Event is held through the streets of inner Sydney and as such, closes a number of important routes through Australia's busiest centre. Pont3, the promoter of the event, in consultation with the RTA and the NSW Police designed a new course which enabled a number of key streets to remain open during the Marathon. However, in order to achieve the ultimate design, a bridge would need to be placed over Park St in the City Centre, from one side of Hyde Park to another. iEDM were approached for assistance in design and delivery of the bridge for the Marathon.Items of special consideration were: Dynamic loading and engineering capability of taking a specified number of runners through the span; Night time construction and traffic / pedestrian management and occupational health and safety through such a busy street; Sight lines for traffic lights and protection of bridge footings whilst the bridge was in place and the road operating with normal traffic; Stairs and block walls which were...

Read More

02 Dec 2015 Sydney 500 V8 Supercar Event

iEDM was engaged by V8 Supercars and the Homebush Motor Racing Authority (a NSW Government Agency) to deliver the inaugural 2009 V8 Supercar Event at Sydney Olympic Park. With a tight design and construction timeframe and approximately $20 Million of capital infrastructure to deliver, this project was a logistical Mount Everest. The 2010 event won the Event of the Year Award at the 2010 Annual V8 Supercars Gala Awards Ceremony. Closing down one of Australia’s largest event centres, the site of the 2000 Sydney Olympics, required a great deal of consultation and liaison with all stakeholders within the busy precinct. Work for the initial event included: Masterplanning of Event Overlay; Event Construction and Project Management; Civil Works Design and Project Management; Capital Works Design and Project Management; Seating Layouts, Corporate Layouts and Merchandising Layouts; Design of complex footing arrangement for new double storey Pit Building Complex; Construction Programming; Stakeholder Consultation and Management; Venue Management of Precinct during Event; Risk Management; Provision of over 80 detailed drawings for construction and operations of the precinct; and, Provision of Safety Officers and Industrial Relations Management. iEDM, in consultation with V8 Supercars and five times V8 Championship winner, Mark Skaife, were tasked with the design and documentation of the circuit itself to FIA standards. These standards must meet the approval...

Read More

02 Dec 2015 V8 Supercars WHS and Risk Management

V8 Supercar Events is the events arm which promotes six rounds of the V8 Supercar Championship nationally throughout Australia. These rounds include Tasmania SuperSprint, Phillip Island SuperSprint, Ipswich SuperSprint, Phillip Island 500, Townsville 400, Ipswich 300, Supercheap Bathurst 1000, Gold Coast 600, Sandown 500 and the Newcastle 500. Some of these events are temporary street circuits with significant high-risk construction work. iEDM works with V8 Supercar Events to create a customised safety package to all of these events including risk management reporting, sub-contractor management and on-site safety officers....

Read More

02 Dec 2015 Pukekohe Park Raceway Upgrades

iEDM was approached by V8SC to assist with the development of a strategy to take the temporary infrastructure from the Hamilton Street Circuit to create a cost effective upgrade to the Pukekohe Park Raceway. The upgrades were to provide: Safety imrovements; Racing improvements; Rejuvinate the pit and paddock area to make a more functional space; New race control, administration and officials building; and Viewing and accessibility improvements. With a limited budget and a tight timeframe, iEDM needed to take very tight control of the deliverables and the overall project. In order to gain the Government funding approval, iEDM guaranteed the price of the project and worked with all stakeholders to make the project a success. Working with our clients and our specialist sub-consultants, we were able to develop a design which created a fresh aesthetic and exciting racing on a circuit where heritage also needed to be retained. iEDM placed a team in Auckland for the duration of the detailed design and delivery stage. Our team procured all items and acted as construction managers. The most pleasing and successful element of the upgrades was the addition of two new corners on the back straight. High speeds along the existing back straight, combined with a fixed runoff meant that we needed...

Read More

02 Dec 2015 Manuka Oval Semi-Permanent Seating

iEDM was engaged by the ACT Department of Sports and Recreation in two stages to: Provide a feasibility report and cost planning into the Government purchasing temporary seating for Manuka oval and then to be used at various State supported events; and, Project management services to procure and construct approximately 1,500 temporary seats at Manuka Oval. The Government’s objective was to firstly create more seating at Manuka Oval to support a recent commitment to host three or more Greater Western Sydney AFL Home Games. Secondly, by using temporary seating, the Government wished to make seating available in between AFL matches to various event promoters to reduce the costs of hosting events in the ACT....

Read More

02 Dec 2015 Gold Coast 2018 Commonwealth Games Live Sites

iEDM was engaged by the Office of Commonwealth Games Coordination (OCGC) to provide preliminary budgets, designs and feasibility reports into four proposed live site venues, operating for the Gold Coast 2018 Commonwealth Games. In order to assist the OCGC to provide a framework to separate their budgets into infrastructure, operations and creative, iEDM was asked to design and cost two alternative overlay plans for each venue. Together with the OCGC, iEDM conducted stakeholder consultation with the various venue stakeholders and incorporated various visions into each design. The end product provided the OCGC with a range of alternatives and associated costs to guide their early strategic planning and development of their creative vision for each of the venues....

Read More