Sandown Turn 6 Redesign

OVERVIEW

In 2018, iEDM were engaged by the Melbourne Racing Club, to investigate options available to improve the safety of the notorious turn 6 at Sandown Raceway. Over the years, Turn 6 has ended the races of many amateur and professional drivers with its high speed, downhill nature catching driver’s out and sending them into the wall.  

As in all racing, accidents are part of the sport and experience. So, the issue wasn’t that drivers were coming off the circuit, the issue that concerned Motorsport Australia and the FIA was the severity of the accidents.  

After a site visit and familiarisation of the circuit, our first step was to assess those accidents. We obtained actual in-car logged data from Supercars Australia and overlaid racing trajectory onto the circuit drawings. This allowed us to assess, with the circuit simulation, the accidents which occurred and subsequent vehicle and driver impacts which were experienced.  

Using the simulation, we plotted escape lines on the circuit to determine the required runoff based on current FIA sporting guidelines. We found that based on 2D analysis, simulated driving lines and runoff trajectories, the spatial allowances of the runoff at Turn 6 generally complied with the FIA Circuit Guidelines.  

The escape lines then considered the different surface treatments available and checked against various incident scenarios.  

The high mid corner speed (180km/h), high approach speed (265km/h) and contestability of the corner leads to a number of drive lines being used during racing. We found that this contributed to a wide variety of incident scenarios which needed to be considered and ultimately played a part in the severity of incidents.

Our recommendations to Melbourne Racing club included earthworks to extend and reshape the runoff, new pavement to improve the grip, re-shaping the inside of the corner and re-building the first and second lines of protection.  

The project is a great example of motorsport engineering – a unique mixture of mechanical engineering, civil engineering, design and motorsport experience.  

Links to Additional Reading:

Sandown Turn 6 Redesign
Sandown Turn 6 Redesign
Sandown Turn 6 Redesign
Sandown Turn 6 Redesign
Sandown Turn 6 Redesign
Sandown Turn 6 Redesign

PROJECT SPECS

DATE

CLIENT

Melbourne Racing Club

2018

VALUE

N/A

SERVICES

SECTOR

RECENT Projects

Throughout our 40 year history, iEDM have assisted in the delivery of a wide variety of major projects around the globe. Below are a just few relevant selections.

READ MORE
READ MORE

FIFA Women's World Cup AUS & NZ 2023

iEDM was honoured to be selected by FIFA Women’s World Cup 2023 Pty Ltd as the Overlay Managing Contractor for the competition venues in Australia, including the prestigious International Broadcast Centre.

SERVICES:

SECTORS:

FORMULA 1 ROLEX AUSTRALIAN GRAND PRIX 2023

Each year, the Albert Park Lake precinct undergoes an extraordinary transformation as it prepares to host one of the most exhilarating motorsport races in the world. In 2023, the event surpassed all expectations, boasting the largest attendance in history and surpassing the record-breaking numbers of 2022, with an incredible 444,631 fans across the four days!

SERVICES:

SECTORS:

2023 Thrifty Newcastle 500

The Newcastle 500 project went beyond a street circuit, encompassing major infrastructure upgrades and urban revitalisation. It involved new water mains, smart city infrastructure, telecommunications networks, stormwater networks, and the creation of additional parking spaces.

SERVICES:

SECTORS:

2022 VALO Adelaide 500

The 2022 VALO Adelaide 500 V8 Supercar event (previously named the Adelaide 500 V8 Supercar Event) kicked off again in December 2022 in spectacular fashion after a Pandemic-forced hiatus.

SERVICES:

SECTORS:

SCROLL