iEDM were engaged by AME Management to plan and oversee the install and delivery of this Supercross event at Marvel Stadium.
This is the first time this event has been held at the venue. With strict engineering requirements and a full Spring events calendar, there were many logistical challenges to overcome.
Turf health was the driving component when setting the project program. To avoid any damage to the playing surface, turf specialists advised that the turf should not be covered for more than 72 hours.
Strict loading conditions set by the stadium engineers informed the method in which the track infrastructure was designed, built and dismantled.
6 months of detailed planning and liaising with many stakeholders including event managers, turf specialists, engineers, traffic and venue management resulted in the successful execution of a detailed project program.
Key data involved in delivering this event:
Challenges overcome:
Related project results:
AME Management, Melbourne
2019
Design, Engineering, Project Management, Construction Management